Rehabilitation of Arugam Bay Bridge

The bridge across the Arugam Bay Lagoon was damaged by the Tsunami. Rehabilitation of the bridge started under the US AID funded Tsunami Affected Area Rehabilitation Project. The proposed rehabilitation consists of the construction of the Main bridge, the small bridge and the approach route to both bridges. Further, Dynamic pile test (PDA) and crosshole sonic logging (CSL) were conducted on a 1000mm diameter bored pile.

GeoTech Limited - Rehabilitation of Arugam Bay Bridge

Client

CH2M Hill, Walkers Piling Ltd.

Date / Period

December 2005 to January 2006 & June 2007 to September 2007

Scope / Work Done

The field investigation carried out consisted of

  • 18 nos boreholes both on and off-shore for the roadway, bridge foundation and construction materials.
  • 25nos. Crosshole Sonic Logging (CSL) and
  • 2 nos Pile Dynamic test (PDA) were performed.

Gallery

GeoTech Limited - Rehabilitation of Arugam Bay Bridge
GeoTech Limited - Rehabilitation of Arugam Bay Bridge
GeoTech Limited - Rehabilitation of Arugam Bay Bridge
GeoTech Limited - Rehabilitation of Arugam Bay Bridge